爆破工程/Blasting Engineering
UEC 开展爆破工程设计/施工......
(1)2007年拜仁钼矿选矿车间二期厂房需要挖掘地基,二期厂房地基紧邻一期厂房,地基岩体为中风化花岗岩,爆破要求不能影响一期车间的生产。不能对一期厂房形成破坏。采用控制爆破成功完成地基基础施工。Smooth Blasting(2007) The projection is a second workshop foundation of Beiren Mu mine’s benefication in Inner Mongolia ,which is near by first workshop. Rock is mid weathering granite. Blasting can’t affect all work of first workshop structure during blasting. Controlling blast had finished for the foundation.
(2)岩锚梁爆破是控制爆破中最难的爆破(2002~2003)。采用专有聚能管的聚能爆破,能够对岩锚梁实施最精准的爆破切割施工。The difficult thing is blast for rock-bolting wall in underground cave tunnel(2002). The special shaped charge blasting can precisely cut rock mass.
(3) 爆破系列软件2DBench, 2DFace, 2DRing, 2Dview, JKBMS设计效果/The results of blasting design are shown with 2DBench , 2DFace, 2DRing, 2Dview

Numerical analysis for 180-shaped-charge-pipe in single hole after detonating

Numerical analysis for 180-shaped-charge-pipe in single hole after detonating

Numerical analysis for many 180-shaped-charge-pipe single hole after detonating

(2003)Numerical analysis for mixing 180-shaped-charge-pipe & 90 -shaped-charge-pipe single hole after detonating

(2003)Numerical analysis for mixing many 180-shaped-charge-pipe & 90-shaped- charge-pipe single hole for cutting steps

(2003)Mixing many 180-shaped-charge-pipe & 90 -shaped-charge-pipe single hole for cutting steps

(2003)Mixing many 180-shaped-charge-pipe & 90 -shaped-charge-pipe single hole after blasting for cutting windows

(2003)Mixing many 180-shaped-charge-pipe & 90 -shaped-charge-pipe single hole after blasting for cutting windows